Concrete pump pumping main points
Publisher:admin  Time:2014/4/7 8:39:17  Click:2263

Concrete pump pumping main points

Source: Author: Date: 2013-08-20 Views: 192 Comments: 0 Favorite Print

Abstract: Concrete pump

  (1) concrete pumpability. Concrete pump pumping requirements can be satisfied, when necessary, to determine the mix of pumping concrete pumping through trial.

    ① maximum ratio of coarse aggregate size and caliber of delivery should be: When pumping height 50m or less, not more than one for gravel: 3, for not more than a pebble: 2.5; pumping height at 50 ~ 100m time , should be 1: 3 to 1: 4 range; pumping height of 100m above, should be 1: 4 to 1: 5 between. Flakiness particle content of not more than 10%.

    ② different pumping height, the pump may slump concrete (Table) selection.

     Pumping height (m) 30 or less than 30 ~ 60 60 ~ 100 100

     Slump (m) 100 ~ 140 140 ~ 160 160 ~ 180 180 ~ 200

    ③ suitable for pumping concrete water-cement ratio (0.4 to 0.6): 1.

    ④ sand pumping concrete should rate was 38% to 45%. Fine aggregate should be adopted in the sand, the amount of sand sieve through 0.315m not less than 15%.

    ⑤ Pumpcrete minimum cement content of 300kg / m3.

(2) concrete pump should start pumping after an appropriate amount of water to wet the concrete pump hopper, concrete cylinder and the feed pipe in direct contact with the concrete site. Pumping water and then using one of these methods lubricate these parts: pumping grout; pumping 1: 2 cement mortar; pumping in addition to other components outside the coarse aggregate ratio of cement mortar.

    Lubricated with grout or cement mortar should be decentralized fabric, not concentrated in the same place pouring.

(3) at the start of pumping, concrete pumps should be in a slow, constant speed running state, and then gradually accelerate. And should observe the work pressure of concrete pumps and systems, and the systems to be able to work behind the normal speed pumping.

(4) work as continuous pumping concrete, concrete cylinder piston stroke should be kept to a maximum run to maximize the performance of concrete pumps and concrete cylinders can wear the uniform in the longitudinal direction.

(5) If there is high pressure concrete pump and unstable temperature rise. When vibration and pumping duct obvious difficulties phenomenon, can not be forcibly pumping, should be excluded immediately identify the cause. Can be obtained with a mallet percussion duct elbow. Conical tubes and other parts, and slow or reverse pumping pumps to prevent clogging.

(6) When a blockage occurs, it should take the following measures:

    ① repeated anti-pump and pump are running, gradually returned to suck out the concrete hopper, by mixing and re-pumped.

    ② with a mallet percussion and other methods to identify the blockage site of repeated anti-pump and pump run until after being hit loose concrete to eliminate clogging.

    ③ When the above two methods are ineffective, should be disassembled after the concrete relief blockage site, re-pumping to be discharged after the blockage.

(7) should be used to pump concrete ready-mix concrete, can also be set up at the scene stirred Station Supply pumping concrete, but not pumping hand mixing concrete. Concrete supply should be strictly controlled, and pay attention to changes in the slump, do not meet the requirements of the concrete pumping is not allowed into the pump, in order to ensure the effective work of the concrete pump.

(8) should be set on a concrete pump hopper screen, and let someone feed monitoring to avoid excessive aggregate diameter or foreign objects entering and causing blockage.

(9) When pumping, the stock of the concrete inside the hopper can not be lower than the position of the agitator shaft to prevent air from entering the pump tube caused by pipeline vibration.

(10) when the concrete pumping process requires terminal interrupt time should not exceed 1h. And should be every 5 ~ 10min anti pumps and pump operation are to prevent the pipeline due to bleeding or concrete slump loss is too large and blocked tubes.

(11) After pumping is completed, must be carefully cleaned hopper and pipeline systems. Residual concrete concrete cylinder if removal is not clean, will solidify on the cylinder wall when the piston is running again, the piston sealing surface will have a direct impact on the cylinder wall to withstand the concrete has cured them, causing the piston to push the local spalling. This damage is different from the normal wear of the piston seals, sealing surface can not be self-compensated under pressure, resulting in leakage of plasma or suck air, causing pumping weakness, blockage.

(12) when the concrete can be poor or the concrete pump bleeding, segregation and difficult to pump, should immediately mix, research concrete pumps, piping and pumping process, etc., and take appropriate measures to resolve.

Pre:Concrete pump master cylinder unable commutation Causes
Next:Concrete pumping Notes
    
 
国产无码久久久久 | 成人免费一区二区三区 | 国产精品久久久精品三级无码 | 黑人系列欧美A√性爱 | 亚洲国产精品国自产拍AV绿帽子 | 蜜臀久久99精品久久久久电影 | 黄色/片视频网站18 秘书人妻91久久汗水 | 高清欧美xxxx | ,亚洲人成毛片在线播放 | 亚洲午夜福利在线观看 | 极品少妇自慰自拍 | 中文字幕一区二区三区在线手机 | 国产精品久久久精品 | 少妇精品动漫日韩 | 丁香草国际视频在线播放 | 成人动漫在线观看 | 亚州免费高清视频 | 无遮挡肉欲少妇A片 | 亚洲欧洲免费无码 | 免费看成人AA片无码视频羞羞网 | 亚洲国产成人久久久久 | 97久久人澡人人添人人爽 | 最新永久免费中文字幕视频 | 午夜福利看片在线 | 老熟女色情在线视频 | 无码专区一区二区免费 | 黄色精品国产成人小说网站免费 | 成人A片产无码免费视频奶头软件 | 精品国产又大又粗又猛又黄 | av久久无码高潮喷吹免费群 | 日韩精品无码一区二区 | 一区二区三区国产探花 | 偷窥自拍亚洲色图 | 一区二区色情在线 | 蜜桃AV噜噜一区二区三区老牛 | 日韩欧美在线播放 | 九一无码成人在线 | 99久久久无码国产一区二区三区 | 久久高清内射无套 | 西西444www无码视频软 | 少妇无套内谢久久久久 |